Lifting & Installation Procedure – Prefab Steel Column
-
Pre-Lift Inspection
• Visually inspect lifting chains, hook block, and lifting accessories for any signs of damage, wear, deformation, or defects.
• Ensure all lifting gear is certified, correctly rated, and free from twists or kinks.
• Confirm exclusion zones are established and the lifting area is clear of personnel. -
Attaching the Chains
• Connect the four-leg chain sling to the prefab steel column using the designated lifting points.
• Ensure all hooks are correctly attached to the double crown ties, as indicated by the steel fixer.
• Check all connections are secure before applying tension to the load. -
Pre-Lift Checks
• Check the identification tag and confirm all lifting ties are secure.
• Maintain clear communication between the slinger signaller and crane operator before starting the lift.
• Ensure unused chain legs are secured back to the master link where applicable. -
Initial Lift & Balance Check
• Slowly raise the column to confirm the load is balanced and stable.
• Use a tag line to control load swing and maintain full control during lifting operations. -
Lowering Into Position
• Carefully lower the prefab steel column into position under full control.
• Operatives must stay clear of the suspended load at all times.
• Prevent anyone from walking underneath the suspended column. -
Securing the Column
• Once in position, the steel fixer must tie and secure all reinforcement bars before removing the lifting chains.
• Confirm the column is stable and secure prior to disconnecting lifting accessories.
Safety Tips & Best Practices – Prefab Steel Column
-
Inspect Before Use
• Never use damaged, worn, or uncertified lifting gear.
• Visually inspect chains, hooks, and lifting points before every lift. -
Communication During Lifting
• The slinger signaller must remain in constant communication with the crane operator.
• Only one designated signaller should give instructions to the crane operator. -
Suspended Loads
• Never stand or walk underneath a suspended load.
• Maintain safe distances while lowering or positioning the column. -
Tag Line Control
• Always use a tag line to control load swing where required.
• Keep hands clear from pinch points while guiding the load. -
Removing Chains
• Keep visual contact with the chains while hoisting them away from the load.
• Ensure chain hooks do not become caught on reinforcement bars or steel elements during removal.
⚠️ Disclaimer
This lifting and installation procedure for prefab steel columns is provided for guidance only.
All lifting operations must strictly follow the approved site-specific Lift Plan and method statement.
Lifting accessories, chain slings, hook blocks, and associated equipment must be visually inspected and confirmed suitable prior to use.
All lifting activities must be supervised by a competent person and carried out in accordance with LOLER, PUWER, BS 7121, and applicable UK construction standards.
Only trained and authorised operatives may carry out lifting and installation operations.
Exclusion zones must be maintained at all times, and no person shall stand or walk beneath a suspended load.
Failure to follow these procedures may result in serious injury, equipment damage, or unsafe lifting operations.