Lifting & Installation Procedure – Excavator Pouring Bucket

Pre-use checks

  • Inspect bucket body, brackets and pins for cracks, distortion or damage.

  • Confirm WLL is suitable for the task and machine.

  • Make sure all bolts and adjustment plates are tight and secure.

  • Set up the quick hitch

  • Select the correct size pins for the excavator.

  • Fit the front pin in the correct hole; adjust the rear pin to suit the hitch.

  • Set pins to maximum centres as per quick-hitch guidance.

  • Attach and check

  • Engage the quick hitch slowly and fully.

  • Ensure locking indicators show locked and retaining bolts are fitted.

  • Carry out a short test lift and tilt — do not use if movement or looseness is seen.

  • Filling

  • Position under the lorry chute with the bucket slightly tilted back.

  • Fill directly from the lorry — do not overfill.

  • Keep edges clean to avoid spillage when travelling.

  • Pouring

  • Track slowly to the pour area, keeping the bucket low.

  • Tilt the bucket to pour in a controlled manner.

  • Stop, re-position and continue as required — no scooping from the ground.

Safety Tips & Best Practices

General

  • Operators must be trained and authorised.

  • Follow the site lifting / pouring plan and manufacturer guidance.

  • Keep all personnel clear of the working area.

  • Before use

  • Check quick hitch, locking pins and adjustment plates.

  • Remove debris from the hitch mechanism.

  • Do not use if the unit does not sit securely.

  • During operation

  • Move slowly, avoid sudden stops and sharp turns.

  • Keep bucket as low as reasonably practicable when travelling.

  • Never attempt to scoop material from stockpiles.

  • Filling & pouring

  • Do not overfill — maintain balance and visibility.

  • Pour by controlled tilting only.

  • Stop immediately if control or visibility is lost.

  • After use

  • Return to the designated cleaning area.

  • Lower onto firm, level ground and clean immediately.

  • Report defects and store upright, safely.

⚠️ Disclaimer

This procedure is provided for general guidance only.
All lifting, attachment and pouring activities must follow the project-specific Lift Plan, Risk Assessment and Method Statement (RAMS).

The excavator, quick hitch, and pouring bucket must be inspected and confirmed suitable before use. Only trained, authorised and competent personnel may carry out these operations.

All works must be completed in compliance with:

  • LOLER 1998

  • PUWER 1998

  • CDM Regulations

  • Manufacturer user manuals and relevant UK construction standards.

This guidance does not replace manufacturer instructions or site procedures and must not be used as standalone training.